In November we introduced the Picture Framing studio which we are converting into two resedential flats. We left the previous article at the point where the plasterers were working in the flats and the internal layout was starting to become structured.
Following the plastering, the second fixes of electrical work, joinery and plumbing took place in tandem to keep the project moving along at pace. The decorators were soon in following this to add the finishing touches to the flats alongside the carpets and flooring going down.
We are proud to show you the finished product below, along with a few pictures back from when we first got the keys to the site to put the transformation in perspective!
Look out for this property hitting the rental market shortly with our sister Lettings Agency No1 Homes!
If seeing this project develop has peaked your interest to see what we can do for you, then please don't hesitate to get in touch with us!
Коментарі